Date Unarco Material Handling Material Worksheet Unarco Territory Manager              
1/20/08 Information marked with an (*) & in yellow are required  [1]
*Distributor Information: *End-User Information:  
*Company:   *Name:*  
*Address:   *Address:  
*City, St. Zip:   *City:  
*Contact:   *State:  
*Phone:   *Zip code:  
*Email:   Comments (attach additional pages, if necessary):
*Fax:    
Quote #     
PO #    
*Pallet Information *Load information Bay 1 Bay 2  
**Please state all measurements in inches** Average weight per pallet (helpful):    
*Does the load overhang the pallet?  [2] *Maximum weight per pallet:    
*If yes, state how many inches below. *Number of pallets per level:    
Front / Rear   Average weight per level: 0 0
Side / Side   Maximum weight per level: 0 0
 
  *Pallet type                                     (attach drawing if possible)  
                         *Pallet Height (including pallet)
    Bay 1:   *General & Options Y / N Quantity  
    Bay 2:   Single rows / How many?    
      Back-to-back rows / How many?    
      If yes, state row spacer length:  
*Pallet Depth:                                      *Pallet Width: Pallet supports / number per level?    
Bay 1:   Bay 1:   Column protectors / How many?    
Bay 2:   Bay 2:   Column protectors height?  
Comments:   Wall Ties / How many?    
Comments:   Wall Ties length?  
*Bay Configuration Cross Aisle Ties / How many?    
    *Clear Ceiling height:   Cross Aisle Ties length?  
 
  Other:  
  *Upright height:  *Bay Profile Bay 1 Bay 2  
  Bay 1:   * Number of beam levels:    
  Bay 2:   *Is there storage on the floor?    
      *Floor to top of 1st level:    
  *Upright depth:  *Floor to top of 2nd level:    
  Bay 1:   *Floor to top of 3rd level:    
  Bay 2:   *Floor to top of 4th level:    
    *Floor to top of 5th level:    
  *Bay width: *Floor to top of 6th level:    
  Bay 1:   Maximum lift height of forklift:  
  Bay 2:   Type of forklift:  
*Please insert your preferred Rack Punching Design: *Engineering Requirements  
 [3] *When will the project ship? MM/DD/YY  
*Is a site manager required?    
General notes (attach additional pages, if necessary): *Is installation required?    
  *Union or non-union?    
*Are stamped engineered calcs & drawings required?  

[1]
Click here to select your Unarco territory manager from the drop down box
[2]
Click to select  Yes or No
[3]
Click this cell  to select your  preferred rack punching design from the drop down box